B2B Returns: Grade First, Then Choose Repair or Replace
B2B returns run on a different logic from retail. Retail says “the customer is unhappy, take it back”. B2B says establish liability first, then agree the remedy. Start negotiating compensation before liability is settled and both sides end up dissatisfied.
B2B returns also carry larger amounts and longer cycles — one badly handled case can wipe out the margin on a whole shipment. Which is why the process should be designed in advance, not improvised under pressure.
Grade the complaint first
| Grade | Typical case | Direction | Cost borne by |
|---|---|---|---|
| A — batch defect | Parameters off across the batch, wrong colour run, packing not as agreed | Rework, replacement or price adjustment | Supplier |
| B — scattered defects | Individual appearance flaws, isolated breakage | Replacement units or make-up volume | Supplier units, freight negotiated |
| C — use damage | Frame breakage, adhesive failure, wear after use | Judged against warranty terms | Split by liability |
Each grade has its own remedy and cost split. Mixing them produces the two classic errors: treating a C-grade issue as A (return the whole batch) or treating A as B (send a few units and move on).

Repair or replace: three numbers decide
The test is not which is more courteous. It is three figures: repair cost, replacement cost, and how long the customer waits.
Repair saves material but costs time, two-way freight and carries a risk of secondary damage. Replacement is fast and clean but writes off a unit outright.
A workable line: if repair costs more than half the goods value, replace. Repair also consumes labour and communication time, and that hidden cost is consistently underestimated.
The other dimension is scale. A-grade defects are not repairable unit by unit — negotiate a batch-level adjustment or replacement. Only B-grade scattered faults suit unit-by-unit make-up.
Liability: three default rules
Agreeing three defaults in advance removes most of the argument.
Found before shipment — supplier bears it. Rework, re-inspection, and the slot cost of delay. The last one is rarely recovered, but it is worth raising.
Caused in transit — split by trade term. Risk passes at FOB, but if the packing cannot survive normal transit you can still argue a packing defect — so write the packing standard into the contract.
Caused by use — split by warranty. Length, coverage and exclusions must be explicit. Whether a broken frame is covered depends on whether it was strung within its tension ceiling; that criterion has to be defined before the dispute, not during it.
Four steps to close a complaint
One, evidence. Photos, quantity, batch number, comparison against the retained sample. Without a batch number you cannot tell a one-off from a systemic issue.
Two, grade it. A/B/C, each with its own route. The buyer proposes the grade; the supplier confirms or objects.
Three, remedy and deadline. Rework or replace, by when, who pays freight. Put the deadline in a written reply — verbal commitments do not count.
Four, close and review. Log it into the supplier scorecard. The second occurrence of the same fault should change your order split, not trigger another round of the same process.

One more operational lever: a pre-agreed default remedy. If the supplier misses the response deadline, a defined outcome applies automatically — a stated price adjustment, or replacement units on the next shipment. Knowing that a default exists is what makes deadlines meaningful; without it, every deadline is advisory.
How to put this into practice
One, put the three grades and three liability rules in the contract annex. Everything downstream rests on them.
Two, set a repair threshold. For example: replace when repair exceeds half the goods value. Written down, so it is not re-argued each time.
Three, require traceable batch numbers. Without them, complaints stay individual cases and systemic problems stay invisible.
Four, score complaints into the supplier review. How a factory handles a problem says more about its management than whether the problem occurred.
Frequently asked questions
Can used goods be returned?
Depends on the warranty terms. A frame that breaks within its tension ceiling in normal play is a warranty case; breakage from over-tensioning is not. Which is why the ceiling must be stated at the point of sale.
Do scattered defects require returning the batch?
No. Scattered faults take make-up units. Batch returns apply to batch defects.
Who pays repair freight?
Split by liability. Where the supplier is responsible they usually cover both ways; if agreement stalls, a price adjustment can substitute for transport.
What if the supplier responds slowly?
Set a response deadline — three working days for a proposal — in the contract. Past the deadline, a pre-agreed default remedy applies. That is the most effective accelerator available.
Want a complaint grading and handling sheet?
If you want the returns process fixed in place — three grades, a repair threshold, liability rules — tell us your categories and the complaint types you actually see and we will return a usable process sheet. Talk to our team.