PPWR Packaging Support for OEM Buyers
Regulation (EU) 2025/40 has applied since 12 August 2026. If you place sporting goods on the EU market, your packaging now needs a technical file, a signed declaration of conformity and a national EPR registration — and most of that file can only be built from data the factory supplies. Rackets, badminton and pickleball, account for most of our OEM packaging work, so that is where the detail on this page sits. This is what we hand over, and where our responsibility stops.
What became mandatory on 12 August 2026
Six obligations. Four of them need something from us; all six end with your signature, not ours.
| Obligation | Article | What we supply | What you do |
|---|---|---|---|
| Heavy metals — Pb, Cd, Hg, Cr(VI) sum ≤ 100 mg/kg | Art. 5 | Per-material test reports from an ISO/IEC 17025 laboratory | Hold the reports in your file |
| Recyclability — baseline | Art. 6 | Material composition and a qualitative design-for-recycling statement | Include in the assessment |
| Technical documentation | Art. 38 + Annex VII | BOM, component list, drawings, material specs, test reports | Compile per packaging type, retain |
| Declaration of conformity | Art. 39 + Annex VIII | The evidence the declaration rests on | Sign it as manufacturer |
| EPR registration | Art. 45(3) | Packaging weights by material, per component per SKU | Register in each member state |
| Harmonised labelling | Art. 12 — from 12 Aug 2028 | Material composition data for the pictogram | Change the artwork |
Dates that are still ahead: 12 August 2028 for harmonised material labelling, 1 January 2030 for the recyclability grades (at least C, 70% by weight), minimum recycled content in plastic packaging and the 50% empty-space limit on sales and e-commerce packaging, and 1 January 2038, from which only grades A and B may be placed on the market.
Who counts as the manufacturer — settle this first
Almost every argument about PPWR paperwork is really an argument about this question. The Commission’s guidance presumes that the owner of the trademark on the packaging is the manufacturer. Having a third party produce it does not move the obligation.
| Your setup | Manufacturer under PPWR | Signs the DoC | EPR registration |
|---|---|---|---|
| You sell under your brand, we produce | You, the brand owner | You | You, per member state |
| You buy our stock range under the FANGCAN brand | Fangcan | Fangcan | Fangcan |
| You are the EU importer, selling under your brand | You | You | You |
Six things you can ask us for
These are issued per packaging type, not per order. Ask once, and they hold until a component changes.
Packaging BOM by homogeneous material
Every component, broken down the way a lab and a register both need it: substrate, coating, ink, adhesive, label, closure, and the weight of each in grams.
Heavy-metal test reports
Pb, Cd, Hg and Cr(VI) per homogeneous material, from an accredited laboratory, with the method and the sample weight on the report.
Recyclability and minimisation statement
Qualitative, written against the Annex II design criteria and the Annex IV minimisation criteria. No grade is claimed, because the grading standards are not published yet.
Packaging weights by material
The figures your national EPR register asks for, per component per SKU. This is the item buyers most often cannot get from a factory.
Design drawings
Components, layers and dimensions — the Annex VII line that says design and manufacturing drawings.
Change notification
We tell you in writing when a substrate, ink, coating or adhesive changes, because that invalidates the file you built on the old one.
What needs a laboratory, and what does not
This is where money gets wasted. Of the six obligations above, exactly one needs a third-party test report at this stage.
| Requirement | Third-party test now? | Reason |
|---|---|---|
| Heavy metals, Art. 5 | Yes | The only PPWR item that needs laboratory evidence from 12 August 2026. |
| PFAS | No | The limits apply to food-contact packaging. Sporting goods packaging is not food-contact. |
| Recyclability grade, Art. 6 | No, until 2030 | Design-for-recycling standards (CEN/TC 261) are due by 2028. Until then a qualitative statement is what can honestly be given. EN 13430 is a self-assessment reference, not proof of conformity. |
| Recycled content, Art. 7 | No, until 2030 | Applies from 1 January 2030; verification rules are still in secondary legislation. Plastic components under 5% of pack weight and under 100 g are exempt. |
| Minimisation, Art. 10 | No | Qualitative assessment against Annex IV. Becomes a hard 50% empty-space limit in 2030. |
| Declaration of conformity, Art. 39 | No | Module A internal production control. Self-assessment. No notified body, no CE mark. |
How the heavy-metal test is actually run
Worth knowing, because a report that does not match this shape will not survive a market surveillance check.
Racket packaging, component by component
Rackets are where most of our OEM packaging work sits, so this is where the detail belongs. The breakdown below is the structure we work to; the confirmed BOM for your SKU is issued from the actual specification, because a change of liner supplier or ink is enough to change it.
| Configuration | Primary packaging | Materials to declare |
|---|---|---|
| Racket only, retail | Card header + OPP bag | Paperboard, PP film, ink, adhesive |
| Racket with cover | Cover or bag + hang tag + OPP bag | Textile or synthetic leather, paperboard, PP film, ink |
| Racket set | Folding carton + inner bags + insert | Paperboard, PP film, ink, adhesive |
| Export master carton | Corrugated carton + tape + stretch film + pallet where used | Corrugated board, BOPP tape, PE film, wood |
The same structure applies to badminton and pickleball rackets. Pickleball paddles, string packs and overgrip cards are documented on the same basis — ask and we issue those BOMs too. The testing and the EPR figures follow the material, not the product line.
EPR and authorised representative are two different things
Providers routinely sell them as one line item. They are separately defined and separately priced, and a quote that blurs them is worth questioning.
| Item | Article | What it actually covers |
|---|---|---|
| Authorised representative | Art. 17 | An EU-established entity that holds your documentation at the disposal of market surveillance authorities and responds within the statutory window. One representative can cover the whole EU. It does not register you as a producer and it does not pay fees. |
| EPR registration | Art. 45(3) | Registration in each national packaging register, ongoing reporting of volumes by material, and payment into that country’s scheme. This is per member state — Germany, France, Italy and Spain each run their own register. |
What we have already done ourselves
For our own-brand shipments we have completed EPR registration in two markets — Germany, through LUCID, the register run by ZSVR, and France, through the ADEME producer register with an eco-organisation mandate through Citeo — and we have appointed an Article 17 authorised representative. That matters for one reason: the sequence below is something we have walked, not something we read.
Be clear about what that does and does not buy you. Those registrations stand in Fangcan’s name, as producer of our own-brand goods. They are not transferable to your shipments and cannot be quoted on your packaging. What they mean is that we can tell you which portal, which document set and which fee category you are about to hit — and introduce you to the representative we use.
Where we can carry the work for you
Beyond the data pack, we can assemble the documentation: build the Annex VII file per packaging type from our BOM and test data, draft the declaration of conformity for your signature, coordinate the laboratory, and put you in touch with the authorised representative we use. The signature stays yours — that part cannot be delegated, and any supplier who offers to sign it for you is offering something that does not work in an audit.
What we will not do
| Not offered | Why |
|---|---|
| Sign your declaration of conformity | The declaration is issued under the sole responsibility of the manufacturer. We are not the manufacturer of your branded packaging, so our signature would be void. |
| Act as your producer for EPR | Registration attaches to a legal person placing packaging on the market under its own responsibility. |
| State that our packaging is “PPWR compliant” in the abstract | Conformity is assessed per packaging type against the requirements in force on a date. A general claim is both unverifiable and, under Art. 12, a green claim that has to be substantiated. |
| Certify recyclability | The grading standards are not published. Anyone certifying a grade today is ahead of the law. |
How it runs
If you already have a compliance provider, we work to their document list instead. Send it — filling a buyer’s template is faster than arguing about formats.
Questions buyers actually ask
Do I need a notified body for PPWR?
No. Article 38 puts conformity assessment under Annex VII, Module A — internal production control. The manufacturer assesses conformity, compiles the technical file and signs the declaration. There is no notified body in the standard case, and Article 39 does not provide for CE marking on packaging; recital 109 says this is deliberate, so a packaging CE mark is not confused with a product CE mark.
Is there such a thing as a PPWR certificate?
No. PPWR is a regulation with self-declaration, not a certification scheme. What exists is a technical file under Annex VII and a signed declaration of conformity under Annex VIII. If a supplier or a lab offers you a “PPWR certificate”, ask which article it is issued under. There isn’t one.
My supplier says their packaging is PPWR compliant. Is that enough?
It is a statement, not evidence. Ask for two things: the Annex VII technical documentation for that packaging type, and the declaration of conformity naming that packaging type. Annex VIII requires each declaration to identify a specific packaging type, so a blanket “all our packaging complies” line does not satisfy it. Also check the date — the file has to be kept current, not issued once.
Which EU member states are you registered in for EPR?
We confirm the current scope per enquiry, because it changes as we add markets, and a page that lists countries goes stale. Ask us in the brief and we will tell you what is live today, in writing.
Will your heavy-metal reports be enough for my declaration of conformity?
They cover the Article 5 evidence for the materials tested. They do not cover your Article 6 recyclability assessment or your Article 10 minimisation assessment, and they do not make you the manufacturer. You still compile the file for your packaging type and sign the declaration; our reports are one input to it.
We changed the artwork on the carton. Do we need to retest?
Depends what changed. A design change that leaves substrates and inks the same does not create a new packaging type and does not normally require retesting. Changing the ink system, the substrate, a coating or an adhesive does — those are the components the Article 5 test covers, and the technical file has to be updated.
Is PVC in the packaging a problem?
It is the first thing we check. PVC scores badly under design-for-recycling criteria, and from 1 January 2030 packaging placed on the EU market has to reach at least grade C — 70% recyclable by weight. From 2038 only grades A and B may be placed on the market. In racket packaging it turns up in two places most often: shrink film, and synthetic-leather covers. If either is specified as PVC, plan the substitution now rather than in 2029.
Start with the packaging you are already buying
Send the SKU list and the destination countries. We will come back with the packaging BOM, the materials that need testing, and a note on anything in the current specification that will not clear 2030.
Send an enquiry
We usually reply within one business day. For a quotation, please include model, quantity and target market.
Regulatory references: Regulation (EU) 2025/40, Arts. 5, 6, 7, 10, 12, 17, 38, 39, 45 and Annexes VII and VIII; Commission guidance published June 2026. This page describes our documentation support. It is not legal advice, and it does not transfer any obligation that rests on the producer or the manufacturer of the packaging.